SPLN

Standar-standar PLN (SPLN) meliputi bidang-bidang:
  • Umum
  • Transmisi 
  • Distribusi
  • Pembangkitan
  • SCADA

BIDANG UMUM
No.
SPLN No.
JUDUL
1
SPLN 4 : 1978
PEMBAGIAN TUGAS KELOMPOK-KELOMPOK PEMBAKUAN






2
SPLN 5 : 1978
TATA TERTIB PEMBAHASAN KONSEP PEMBAKUAN






3
SPLN 6 : 1978
PEDOMAN UNTUK PENYUSUNAN NASKAH STANDAR






4
SPLN 29 : 1980
PENYUSUNAN KONSEP PEMBAKUAN UNTUK PERALATAN LISTRIK 


PRODUKSI DALAM NEGERI



5
SPLN 36A : 1980
LOADING TESTS ON OVERHEAD LINE TOWERS






6
SPLN 66 : 1986
STANDAR PERALATAN KESELAMATAN KERJA



7
SPLN 66A : 1986
TERMINOLOGI UNTUK PERKAKAS DAN PERLENGKAPAN YANG


DIGUNAKAN UNTUK PEKERJAAN BERTEGANGAN



8
SPLN 67-1A : 1986
KONDISI SPESIFIK INDONESIA


BAGIAN SATU : A. KONDISI ALAM



9
SPLN 67-1B : 1986
KONDISI SPESIFIK INDONESIA


BAGIAN SATU : B. DESAIN DAN OPERASI SISTEM



10
SPLN 67-1C : 1987
KONDISI SPESIFIK DI INDONESIA


BAGIAN SATU : C. PUSAT LISTRIK TENAGA TERMAL



11
SPLN 67-2A : 1986
KONDISI SPESIFIK INDONESIA


BAGIAN DUA : A. PEMBANGKIT LISTRIK TENAGA AIR



12
SPLN 67-2B : 1986
KONDISI SPESIFIK INDONESIA


BAGIAN DUA : B. KOMISIONING DAN PENGUJIAN INSTALASI


                                  LISTRIK



13
SPLN 67-2C : 1986
KONDISI SPESIFIK INDONESIA


BAGIAN DUA : C. PENGENDALIAN DAN PENGAWASAN MUTU






14
SPLN 69-1 : 1986
STANDARISASI PERALATAN UJI


BAGIAN SATU : KOMISIONING INSTALASI DAN PENGUJIAN 


                               PERALATAN



15
SPLN 69-2 : 1987
STANDARISASI PERALATAN UJI


BAGIAN DUA : STANDAR PERALATAN UJI



16
SPLN 70-1 : 1985
PEMBAKUAN ISTILAH TEKNIK BIDANG KELISTRIKAN



17
SPLN 70-2 : 1986
PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN


(SERI KEDUA)



18
SPLN 70-3 : 1987
PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN


(SERI KETIGA)



19
SPLN 70-4 : 1992
PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN


(SERI KEEMPAT)



20
SPLN 70-5 : 1995
PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN


(SERI KELIMA)



21
SPLN 70-6 : 1995
PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN


(SERI KEENAM)



22
SPLN 70-7 : 1995
PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN


(SERI KETUJUH)



23
SPLN 71-1 : 1987
PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN


(SERI PERTAMA)



24
SPLN 71-2 : 1989
PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN


(SERI KEDUA)



25
SPLN 71-3 : 1993
PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN


(SERI KETIGA)



26
SPLN 99 : 1992
WARNA LAMBANG STANDAR UNTUK DIAGRAM MIMIK



27
SPLN 104 : 1993
WARNA STANDAR



28
SPLN 105 : 1995
PERWAJAHAN PUBLIKASI SPLN



29
SPLN 106 : 1993
TANDA KESELAMATAN KERJA



30
SPLN 107 : 1993
WARNA PIPA DAN TANGKI PUSAT LISTRIK









BIDANG TRANSMISI

SPLN 2 : 1978 PENTANAHAN NETRAL SISTEM TRANSMISI, SUB-TRANSMISI DAN DISTRIBUSI BESERTA PENGAMANANNYA

SPLN 7 : 1978 PEDOMAN PEMILIHAN TINGKAT ISOLASI TRANSFORMATOR
DAN PENANGKAP PETIR

SPLN 7A : 1978 KOORDINASI ISOLASI BAGIAN 1 : ISTILAH, DEFINISI,PRINSIP DAN KETENTUAN

SPLN 7B : 1978 KOORDINASI ISOLASI BAGIAN 2 : PEDOMAN APLIKASI

SPLN 7C : 1978 LIGHTNING ARRESTER PART 1 : NON LINEAR RESISTOR TYPE ARRESTER FOR AC SYSTEM

SPLN 7D : 1978 RECOMMENDATIONS FOR LIGHTNING ARRESTERS PART 1 : NON LINEAR RESISTOR -TYPE ARRESTERS

SPLN 8-1 : 1991 TRANSFORMATOR TENAGA BAGIAN 1 : UMUM

SPLN 8-2 : 1991 TRANSFORMATOR TENAGA BAGIAN 2 : KENAIKAN SUHU

SPLN 8-3-1 : 1991 TRANSFORMATOR TENAGA BAGIAN 3-1 : TINGKAT ISOLASI DAN UJI DIELEKTRIK JARAK BEBAS LUAR DI UDARA

SPLN 8-3 : 1991 TRANSFORMATOR TENAGA BAGIAN 3 : TINGKAT ISOLASI DAN UJI DIELEKTRIK

SPLN 8-4 : 1991 TRANSFORMATOR TENAGA BAGIAN 4 : SADAPAN DAN HUBUNGAN

SPLN 8-5 : 1991 TRANSFORMATOR TENAGA BAGIAN 5 : KEMAMPUAN MENAHAN HUBUNG SINGKAT

SPLN 9A : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 1 : GENERAL AND DEFINITIONS

SPLN 9B : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 2 : RATING

SPLN 9C : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 3 : DESIGN AND CONSTRUCTION

SPLN 9D : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 4 : TYPE TESTS AND ROUTINE TESTS

SPLN 9E : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 4 : TYPE TESTS AND ROUTINE TESTS
APPENDIX E- : METHODS OF DETERMINING PROSPECTIVE TRANSIENT RECOVERY VOLTAGE WAVES

SPLN 9F : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 5 : RULES FOR THE SELECTION OF CIRCUIT BREAKERS FOR SERVICE

SPLN 9G : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 6 : INFORMATION TO BE GIVEN WITH ENQUIRIES,TENDERS AND ORDERS RULES FOR TRANSPORT, ERECTION AND MAINTENANCE

SPLN 10-1 : 1978 KETENTUAN TENTANG JENIS DAN UKURAN ISOLATOR YANG
DIPILIH

SPLN 10-1A : 1996 ISOLATOR RENTENG JENIS KAP DAN PIN

SPLN 10-1B : 1978 DIMENSI BOLA DAN KOPLING SENDI DARI UNIT (SATUAN)
ISOLATOR RENTENGAN

SPLN 10-1C : 1978 LOCKING DEVICES FOR BALL AND SOCKET COUPLINGS OF
STRING INSULATOR UNITS
PART 1 : DIMENSIONS AND GENERAL RULES

SPLN 10-1D : 1978 LOCKING DEVICES FOR BALL AND SOCKET COUPLINGS OF
STRING INSULATOR UNITS
PART 2 : TESTS

SPLN 10-1E-1 : 1996 ISOLATOR UNTUK SALURAN UDARA DENGAN TEGANGAN
NOMINAL DIATAS 1000 VOLT
BAGIAN 1 : UNIT ISOLATOR KERAMIK ATAU GELAS UNTUK
SISTEM ARUS BOLAK BALIK, DEFINISI ,METODE UJI
DAN KRITERIA SERAH TERIMA.

SPLN 10-1E-2 : 1996 ISOLATOR UNTUK SALURAN UDARA DENGAN TEGANGAN
NOMINAL DIATAS 1000 VOLT
BAGIAN 2 : RENTENGAN ISOLATOR DAN SET ISOLATOR UNTUK
SISTEM ARUS BOLAK BALIK, DEFINISI ,METODE UJI
DAN KRITERIA SERAH TERIMA.

SPLN 10-1F : 1989 PENGUJIAN TEGANGAN IMPULS HUBUNG PADA ISOLATOR
TEGANGAN TINGGI

SPLN 10-2A : 1978 TEST ON INDOOR AND OUTDOOR POST INSULATORS FOR
SYSTEM WITH NOMINAL VOLTAGE GREATER THAN 1000V

SPLN 10-2B : 1978 DIMENSIONS OF INDOOR AND OUTDOOR POST INSULATORS
AND POST INSULATOR UNITS FOR SYSTEMS WITH NOMINAL
VOLTAGES GREATER THAN 1000 V

SPLN 10-3B : 1993 TINGKAT INTENSITAS POLUSI SEHUBUNGAN DENGAN PEDOMAN
PEMILIHAN ISOLATOR

SPLN 10-4A : 1994 ISOLATOR TONGGAK PIN (PIN POST) UNTUK SALURAN UDARA
TEGANGAN MENENGAH 20 kV

SPLN 10-4B : 1995 ISOLATOR TONGGAK SALURAN UNTUK SALURAN UDARA
TEGANGAN MENENGAH 20 kV

SPLN 10-4C : 1997 ISOLATOR PIN UNTUK SALURAN UDARA TEGANGAN MENENGAH
20 kV

SPLN 11A : 1978 HIGH VOLTAGE TEST TECHNIQUES
PART 1 : GENERAL DEFINITIONS AND TEST REQUIREMENTS

SPLN 11B : 1978 HIGH VOLTAGE TEST TECHNIQUES
PART 2 : TEST PROCEDURES

SPLN 11C : 1978 HIGH VOLTAGE TEST TECHNIQUES
PART 3 : MEASURING DEVICES

SPLN 11D : 1978 REKOMENDASI PENGUKURAN TEGANGAN DENGAN MENGGUNA
KAN SELA BOLA (SATU BOLA DITANAHKAN)

SPLN 13 : 1978 KRITERIA DASAR BAGI PERENCANAAN SALURAN UDARA
TEGANGAN TINGGI 66 kV DAN 150 kV

SPLN 15 : 1979 PEDOMAN PEMILIHAN JENIS DAN UKURAN PENGHANTAR
ALUMINIUM BAGI SALURAN UDARA 20 kV, 66 kV dan 150 kV

SPLN 16 : 1979 PEDOMAN PENERAPAN SALURAN UDARA TEGANGAN TINGGI
66 KV DAN 150 KV DENGAN ISOLATOR TONGGAK SALURAN

SPLN 17 : 1979 PEDOMAN PEMBEBANAN TRANSFORMATOR TERENDAM MINYAK


SPLN 17A : 1979 LOADING GUIDE FOR OIL-IMMERSED TRANSFORMERS

SPLN 18A : 1979 ON LOAD TAP CHANGERS

SPLN 18B : 1979 PEDOMAN PENERAPAN PENGUBAH SADAPAN BERBEBAN

SPLN 31 : 1980 TEGANGAN PENGENAL TRANSFORMATOR DAN JANGKAUAN
PENYADAPAN PENGUBAH SADAPAN BERBEBAN PADA SISTEM
66 KV DAN 150 KV

SPLN 37A : 1980 APLICATION GUIDE FOR POWER TRANSFORMERS

SPLN 49-1 : 1982 MINYAK ISOLASI
BAGIAN 1 : PEDOMAN PENERAPAN SPESIFIKASI DAN
PEMELIHARAAN MINYAK ISOLASI

SPLN 49-1A : 1982 SPESIFICATION FOR NEW INSULATING OILS FOR TRANSFORMERS
AND SWITCHGEAR

SPLN 49-1B : 1982 MAINTENANCE AND SUPERVISION GUIDE FOR INSULATING OILS
IN SERVICE

SPLN 49-2 : 1982 MINYAK ISOLASI
BAGIAN 2 : PEDOMAN PENERAPAN METODE IEC UNTUK ANALISA
MINYAK ISOLASI

SPLN 52-1 : 1983 POLA PENGAMANAN SISTEM
BAGIAN 1 : A. SISTEM TRANSMISI 66 KV

SPLN 52-1 : 1983 POLA PENGAMANAN SISTEM
BAGIAN 1 : C. TRANSFORMATOR 150/66 KV, 150/20 KV DAN
66/20 KV

SPLN 52-2 : 1985 POLA PENGAMANAN SISTEM
BAGIAN 2 : GENERATOR

SPLN 52-3 : 1983 POLA PENGAMANAN SISTEM
BAGIAN 3 : SISTEM DISTRIBUSI 6 KV DAN 20 KV

SPLN 61 : 1997 SPESIFIKASI TRANSFORMATOR TENAGA TEGANGAN TINGGI

SPLN 65 : 1985 PETUNJUK PEMILIHAN DAN PENGGUNAAN RELAI STATIS

SPLN 73 : 1987 KOMISIONING JARINGAN

SPLN 78 : 1987 PERHITUNGAN PENGARUH ARUS HUBUNG SINGKAT

SPLN 82-1 : 1991 PEKERJAAN DALAM KEADAAN BERTEGANGAN
BAGIAN 1 : PERATURAN UMUM

SPLN 82-2 : 1991 PEKERJAAN DALAM KEADAAN BERTEGANGAN
BAGIAN 2 : - JARINGAN TEGANGAN RENDAH
- PERSYARATAN KERJA DAN LEMBARAN TEKNIK
PERKAKAS.

SPLN 82-3 : 1993 PEKERJAAN DALAM KEADAAN BERTEGANGAN
BAGIAN 3 : - JARINGAN TEGANGAN MENENGAH
- PERSYARATAN KERJA DAN LEMBARAN TEKNIK
PERKAKAS.
LAMPIRAN
SPLN 82-3 : 1993 LEMBARAN TEKNIK PERKAKAS DAN LEMBARAN TEKNIK-METODE
OPERASI


SPLN 100-3 : 1993 SALURAN UDARA TEGANGAN TINGGI
PEMBEBANAN PENYANGGA SALURAN UDARA
BAGIAN III : PEMBEBANAN KHUSUS

SPLN 112 : 1994 AMBANG BATAS KUAT MEDAN LISTRIK DAN INDUKSI MEDAN
MAGNIT DIBAWAH SALURAN TEGANGAN TINGGI DAN EKSTRA
TINGGI

SPLN 119 : 1996 TIANG BETON PRATEKAN UNTUK SALURAN UDARA TEGANGAN
TINGGI 70 KV DAN 150 KV

SPLN 120 : 1996 TIANG BAJA UNTUK SALURAN UDARA TEGANGAN TINGGI 70 KV
DAN 150 KV

SPLN 121 : 1996 KONSTRUKSI SALURAN UDARA TEGANGAN TINGGI 70 KV DAN
150 KV DENGAN TIANG BETON/BAJA

SPLN 68-1B : 1986 TINGKAT JAMINAN SISTEM TENAGA LISTRIK
BAGIAN SATU : SISTEM TENAGA HULU
A. TRANSMISI






BIDANG DISTRIBUSI      
 
SPLN 1 : 1995    TEGANGAN-TEGANGAN STANDAR
SPLN 3 :1978    PENTANAHAN JARING TEGANGAN RENDAH PLN DAN PENTANAHAN INSTALASI
   
SPLN 12 : 1978    PEDOMAN PENERAPAN SISTEM DISTRIBUSI 20 KV FASA-TIGA, 4-KAWAT
   
SPLN 14 : 1979    KRITERIA DASAR BAGI PERENCANAAN SALURAN UDARA TEGANGAN MENENGAH 20 KV SERTA TEGANGAN TINGGI 66 KV DAN 150 KV
   
   
SPLN 26 : 1980    PEDOMAN PENERAPAN SISTEM DISTRIBUSI 20 KV FASA-TIGA, 3-KAWAT DENGAN TAHANAN RENDAH DAN TAHANAN TINGGI
   
   
SPLN 27 : 1980    PENTANAHAN INSTALASI KONSUMEN UNTUK PELISTRIKAN DESA
SPLN 39-1 :1981    PENGUJIAN KABEL LISTRIK
SPLN 39-2 :1981    PENGUJIAN KABEL LISTRIK
     - Pengujian Latu Listrik
     - Pengujian retak pada suhu rendah untuk isolasi dan selubung PVC
   
SPLN 40-1 : 1981    TANDA TANDA PENGENAL UNTUK KAWAT DAN KABEL LISTRIK BERISOLASI
   
SPLN 41-1 :1991    PERSYARATAN PENGHANTAR TEMBAGA DAN ALUMINIUM UNTUK KABEL LISTRIK BERISOLASI
   
SPLN 41-2 :1981    PERSYARATAN KOMPON PVC UNTUK KAWAT DAN KABEL LISTRIK TEGANGAN NOMINAL 0,6/1 KV
   
SPLN 41-2 : 1991    PERSYARATAN KOMPON PVC UNTUK ISOLASI DAN SELUBUNG KABEL LISTRIK
   
SPLN 41-3 : 1981    PERSYARATAN KOMPON KARET UNTUK KAWAT DAN KABEL LISTRIK TEGANGAN NOMINAL S/D 1000 V
   
SPLN 41-4 : 1981    HANTARAN TEMBAGA TELANJANG JENIS SETENGAH KERAS (BCC 1/2 H)
   
SPLN 41-5 : 1981    HANTARAN TEMBAGA TELANJANG JENIS KERAS (BCC  H)
SPLN 41-6 : 1981    HANTARAN ALUMINIUM (AAC)
SPLN 41-7 : 1981    HANTARAN ALUMINIUM BERPENGUAT BAJA (ACSR)
SPLN 41-8 : 1981    HANTARAN ALUMINIUM CAMPURAN (AAAC)
SPLN 41-9 : 1986    PERSYARATAN KOMPON XLPE UNTUK KABEL BERTEGANGAN PENGENAL DIATAS 1 kV S/D 30 kV
   
SPLN 41-10 : 1991    PENGHANTAR ALUMINIUM PADUAN BERSELUBUNG POLIETILEN IKAT SILANG (AAAC-S)
   
SPLN 41-11 :1992    PERSYARATAN ISOLASI DAN SELUBUNG PE KABEL LISTRIK
SPLN 42-1 : 1991    KAWAT BERISOLASI PVC TEGANGAN PENGENAL 450/750 V (NYA)
   
SPLN 42-2 : 1992    KABEL BERISOLASI DAN BERSELUBUNG PVC TEGANGAN PENGENAL  300/500 VOLT (NYM)
   
SPLN 42-3 : 1992    KAWAT FLEKSIBEL BERISOLASI PVC TEGANGAN PENGENAL 450/750 V (NYAF)
   
SPLN 42-4 : 1992    KAWAT FLEKSIBEL KEMBAR DUA DAN TIGA BERISOLASI PVC TEGANGAN PENGENAL 300/300 VOLT (NYZ/NYD)
   
SPLN 42-5 : 1981    KAWAT BERISOLASI KARET TEGANGAN NOMINAL 1000 V (NGA)
   
SPLN 42-6-1 : 1991    KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
    TEGANGAN PENGENAL 300/300 V UNTUK BEBAN MEKANIS RINGAN (NYLHYrd/NYLHYf1)
   
SPLN 42-6-2 : 1991    KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
    TEGANGAN PENGENAL 300/500 V UNTUK BEBAN MEKANIS SEDANG (NYLHYrd/NYLHYf1)
   
SPLN 42-6-3 : 1991    KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
    TEGANGAN PENGENAL 450/750 V UNTUK BEBAN MEKANIS BERAT (NYSHY)
   
SPLN 42-7 : 1992    KABEL PIPIH BERISOLASI DAN BERSELUBUNG PVC TEGANGAN PENGENAL 300/500 V (NYIFY)
   
SPLN 42-8 : 1981    NYMT PVC INSULATED SELF SUPPORTING AERIAL CABLE WITH BLACK OUTER SHEATH RATED VOLTAGE 500 V (UNOFFICIAL)
   
   
SPLN 42-9 : 1981    KABEL BERISOLASI DAN BERSELUBUNG PVC TEGANGAN NOMINAL 500 V (NYM OVAL)
   
SPLN 42-10 : 1993    KABEL PILIN UDARA TEGANGAN PENGENAL 0,6/1 KV (NFA2X-T/NFA2X/NF2X)
   
SPLN 42-11 : 1991    KABEL SAMBUNGAN RUMAH BERISOLASI XLPE DAN B ERSELUBUNG PVC DENGAN PENGHANTAR KONSENTRIS TEMBAGA TEGANGAN PENGENAL 0,6/1 KV (N2XCY-SR/NA2XCY-SR)
   
   
   
SPLN 43-1 : 1994    KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, TEGANGAN PENGENAL 0,6/1 KV (NYY/NAYY)
   
SPLN 43-2 : 1994    KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, BERPERISAI KAWAT BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (NYFGbY/NAYFGbY/NYRGbY/NAYRGbY)
   
   
   
SPLN 43-3 :1994    KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, BERPERISAI PITA BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (NYBY/NAYBY)

        SPLN 43-4 : 1994    KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, DENGAN PENGHANTAR KONSENTRIS TEMBAGA TEGANGAN PENGENAL 0,6/1 KV (NYCY/NAYCY)   
   
SPLN 43-5-1 : 1995    KABEL PILIN TANAH BERISOLASI XLPE DAN BERSELUBUNG PE/PVC DENGAN TEGANGAN PENGENAL 12/20 (24) KV
   
SPLN 43-5-2 : 1995    KABEL PILIN UDARA BERISOLASI XLPE DAN BERSELUBUNG PVC BERPENGGANTUNG KAWAT BAJA DENGAN TEGANGAN PENGENAL 12/20 (24) KV
   
   
SPLN 43-5-3 :1995    KABEL TANAH INTI TUNGGAL BERISOLASI XLPE DAN BERSELUBUNG PE/PVC DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
   
   
SPLN 43-5-4 : 1995    KABEL TANAH INTI TIGA BERISOLASI XLPE DAN BERSELUBUNG PE/PVC DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
   
   
SPLN 43-5-5 : 1995    KABEL TANAH INTI TUNGGAL BERISOLASI XLPE DAN BERSELUBUNG PE/PVC BERPENGHANTAR KONSENTRIS DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
   
   
   
SPLN 43-5-6 : 1995    KABEL TANAH INTI TIGA BERISOLASI XLPE DAN BERSELUBUNG PE/PVC BERPENGHANTAR KONSENTRIS DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
   
   
   
SPLN 43-6 : 1994    KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC TEGANGAN PENGENAL 0,6/1 KV (N2XY/NA2XY)
   
SPLN 43-7 : 1994    KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC BERPERISAI KAWAT BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (N2XFGbY/NA2XFGbY/N2XRGbY/NA2XRGbY)
   
   
   
SPLN 43-8 : 1994    KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC BERPERISAI PITA BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (N2XBY/NA2XBY)
   
   
SPLN 50 : 1997    SPESIFIKASI TRANSFORMATOR DISTRIBUSI
   
SPLN 54 : 1983    STANDAR TIANG BAJA
   
SPLN 55 : 1990    ALAT PENGUKUR, PEMBATAS DAN PERLENGKAPANNYA
     - LAMPIRAN D :
        APP TIPE KHUSUS II A S/D II F DGN TUTUP PELINDUNG
   
SPLN 56-1 : 1993    SAMBUNGAN TENAGA LISTRIK TEGANGAN RENDAH (SLTR)
   
SPLN 56-2 : 1994    SAMBUNGAN TENAGA LISTRIK TEGANGAN MENENGAH
    (SLTM)
   
SPLN 56-3-1 : 1996    SAMBUNGAN TENAGA LISTRIK TEGANGAN MENENGAH
    DIATAS 8 MVA S/D 60 MVA
    BAGIAN 1 : SALURAN KABEL DIBAWAH TANAH
   
SPLN 56  : 1984    SAMBUNGAN LISTRIK
   
SPLN 57-1 : 1991    KWH METER ARUS BOLAK BALIK
    KELAS 0,5 ; 1 DAN 2
    BAGIAN 1 : PASANGAN DALAM
   
SPLN 57-2 : 1993    KETENTUAN UJI TAMBAHAN UNTUK KWH METER PASANGAN
    LUAR
   
SPLN 57-3 : 1993    METER STATIK ARUS BOLAK BALIK UNTUK ENERGI AKTIF
    (KELAS 0,2S DAN 0,5S)
   
SPLN 57-4 : 1994    METER STATIS ENERGI AKTIF ARUS BOLAK BALIK (KELAS 1
    DAN 2 )
   
SPLN 59  : 1985    KEANDALAN PADA SISTEM DISTRIBUSI 20 kVdan 6 kV
   
SPLN 60-1  : 1992    KAMAR UJI INSTRUMEN UKUR LISTRIK
   
SPLN 60-2  : 1992    KAMAR UJI INSTRUMEN UKUR LISTRIK
    BAGIAN 2 : PROSEDUR SALING BANDING SEL STANDAR DAN
                           RESISTOR STANDAR.
   
SPLN 60-3  : 1992    KAMAR UJI INSTRUMEN UKUR LISTRIK
    BAGIAN 3 : PROSEDUR UJI INSTRUMEN UKUR ENERGI LISTRIK
   
SPLN 60-4  : 1992    KAMAR UJI INSTRUMEN UKUR LISTRIK
    BAGIAN 4 : PROSEDUR UJI PENUNJUK KEBUTUHAN MAKSIMUM
   
SPLN 60-5  : 1992    KAMAR UJI INSTRUMEN UKUR LISTRIK
    BAGIAN 5 : PROSEDUR UJI PERLENGKAPAN UJI METER ENERGI
                           LISTRIK
   
SPLN 60-6  : 1992    KAMAR UJI INSTRUMEN UKUR LISTRIK
    BAGIAN 6 : PROSEDUR UJI INSTRUMEN UKUR LISTRIK PENUN
                           JUK LANGSUNG
   
SPLN 60-7  : 1992    KAMAR UJI INSTRUMEN UKUR LISTRIK
    BAGIAN 7 : PROSEDUR UJI TRANSFORMATOR INSTRUMEN
   
SPLN 60  : 1985    STANDARISASI KAMAR TERA
   
SPLN 63  : 1991    INSPEKSI PENERIMAAN METER KILOWATTJAM ARUS BOLAK
    BALIK KELAS 2
   
SPLN 64  : 1985    PETUNJUK PEMILIHAN DAN PENGGUNAAN PELEBUR PADA
    SISTEM DISTRIBUSI TEGANGAN MENENGAH
   
SPLN 72  : 1987    SPESIFIKASI DESAIN UNTUK JARINGAN TEGANGAN MENENGAH
    DAN JARINGAN TEGANGAN RENDAH
   
SPLN 74  : 1987    STANDAR LISTRIK PEDESAAN
   
SPLN 75  : 1987    GANGGUAN PADA SISTEM SUPLAI YANG DIAKIBATKAN OLEH
    PEMANFAAT LISTRIK DAN PERLENGKAPAN SERUPA
   
SPLN 76  : 1987    TRANSFORMATOR ARUS
   
SPLN 77  : 1987    TRANSFORMATOR TEGANGAN
   
SPLN 83  : 1991    LENGKAPAN SAMBUNGAN RUMAH DENGAN SALURAN UDARA
    BERISOLASI
   
SPLN 84  : 1992    KONEKTOR TEMBUS KEDAP AIR UNTUK KABEL PILIN UDARA
    TEGANGAN RENDAH
   
SPLN 87  : 1991    STANDAR KONSTRUKSI LISTRIK PEDESAAN
   
SPLN 88  : 1991    PEMBUMIAN NETRAL SISTEM 20 KV DENGAN LEBIH DARI SATU
    SUMBER
   
SPLN 91-1  : 1992    SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
    BAGIAN 1 : PERSYARATAN UMUM
   
SPLN 91-2  : 1994    SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
    BAGIAN 2 : DIAMETER LUAR PIPA DAN ULIR
   
SPLN 91-3  : 1994    SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
    BAGIAN 3 : PERSYARATAN KHUSUS PIPA LOGAM
   
SPLN 91-4  : 1994    SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
    BAGIAN 4 : PERSYARATAN KHUSUS PIPA LISTRIK ISOLASI KAKU
                           RATA
   
SPLN 91-5  : 1995    SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
    BAGIAN 5 : PERSYARATAN KHUSUS PIPA LISTRIK FLEKSIBEL
   
SPLN 93  : 1991    TIANG BETON PRATEKAN UNTUK JARINGAN DISTRIBUSI
   
SPLN 94  : 1993    METER VAR - JAM (ENERGI REAKTIF)
   
SPLN 95  : 1994    TRANSFORMATOR DENGAN PENGAMAN SENDIRI FASE
    TUNGGAL UNTUK JARINGAN SISTEM FASE TIGA 4 - KAWAT
   
SPLN 96  : 1993    PERLENGKAPAN UJI UNTUK METER ENERGI LISTRIK
   
SPLN 97  : 1993    ALAT PENUNJUK KEBUTUHAN DAYA MAKSIMUM KELAS 1
   
SPLN 98  : 1992    LENGKAPAN PEGANG KABEL PILIN SALURAN UDARA TEGANGAN
    RENDAH
   
SPLN 101  : 1992    KONEKTOR ALUR PARALEL UNTUK PENGHANTAR TELANJANG
   
SPLN 102  : 1993    ELEKTRODA BUMI JENIS BATANG BULAT BERLAPIS TEMBAGA
   
SPLN 103  : 1993    SAKLAR WAKTU UNTUK KONTROL TARIF DAN KENDALI BEBAN
   
SPLN 108  : 1993    PEMUTUS TENAGA MINI UNTUK PEMBATAS DAN PENGAMAN
    ARUS LEBIH UNTUK INSTALASI GEDUNG DAN RUMAH
   
SPLN 114  : 1993    BLOK TERMINAL
   
SPLN 115  : 1995    TIANG KAYU UNTUK JARINGAN DISTRIBUSI
   
SPLN 118-3-1  : 1996    PERANGKAT HUBUNG BAGI
    BAGIAN 3-1 : SPESIFIKASI PERANGKAT HUBUNG BAGI
                               TEGANGAN RENDAH GARDU DISTRIBUSI
   
SPLN 118-4-1  : 1996    PERANGKAT HUBUNG BAGI
    BAGIAN 4-1 : SPESIFIKASI PERANGKAT HUBUNG BAGI
                               TEGANGAN MENENGAH GARDU DISTRIBUSI
   
SPLN D3.002-1 : 2007    SPESIFIKASI TRANSFORMATOR DISTRIBUSI
    BAGAIAN 1 : TRANSFORMATOR FASE TIGA, 20 KV-400V &
                              TRANSFORMATOR FASE TUNGGAL, 20 KV-231 DAN
                              20/Ö3 KV-231 V
   
SPLN 68-2 : 1986    TINGKAT JAMINAN SISTEM TENAGA LISTRIK
    BAGIAN DUA : SISTEM DISTRIBUSI
   
    
 
 
 
 
 
BIDANG PEMBANGKITAN

SPLN 19 : 1979    PEMBAKUAN PERALATAN LABORATORIUM PLTU
   
   
SPLN 20 : 1980    PEDOMAN PENERAPAN UNTUK KOMISIONING, PENGUSAHAAN
    DAN PEMELIHARAN TURBIN AIR
   
SPLN 20A : 1978    GUIDE FOR COMISSIONING, OPERATION AND MAINTENANCE OF
    HYDROLIC TURBINES
   
SPLN 21A : 1980    INTERNATIONAL CODE FOR THE FIELD ACCEPTANCE TESTS OF
    HYDROLIC TURBINES
   
SPLN 22 : 1980    IKHTISAR PERENCANAAN DAN HAL-HAL YANG PERLU DIPERHATI
    PADA BLOK PONDASI UNTUK MESIN DIESEL MENURUT BSI CP
    2021 : PART 1
   
SPLN 23A : 1980    RECIPROCATING INTERNAL COMBUSTION ENGINES - DEFINITIONS
    OF LOCATIONS ON AN ENGINE
   
SPLN 23B : 1980    RECIPROCATING INTERNAL COMBUSTION ENGINES - VOCABULARY
   
   
SPLN 23C : 1980    RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
    PART 1 : STANDARD REFERENCE CONDITIONS AND DECLARATIONS
                     OF POWER, FUEL CONSUMPTION AND LUBRICATING OIL
                     CONSUMPTION
   
SPLN 23D : 1980    RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
    PART 2 : TEST METHODS
   
SPLN 23E : 1980    RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
    PART 3 : TEST MEASUMENTS
   
SPLN 23F : 1980    RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
    PART 4 : SPEED GOVERNING
   
SPLN 23G : 1980    RECIPROCATING INTERNAL COMBUSTION ENGINES - DESIGNATION
    OF THE DIRECTION OF ROTATION
   
SPLN 23H : 1980    RECIPROCATING INTERNAL COMBUSTION ENGINES - DESIGNATION
    OF THE CYLINDERS
   
SPLN 24 : 1980    GUIDE FOR COMISSIONING, OPERATION AND MAINTENANCE OF
    DIESEL ENGINES
   
SPLN 25 : 1980    PEDOMAN PENERAPAN UNTUK KOMISIONING, PENGUSAHAAN DAN
    PEMELIHARAAN MESIN DIESEL.
   
SPLN 30 : 1980    PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA KIMIA AIR
   
SPLN 32 S1 : 1984    SUPLEMEN PERTAMA SPLN 32 1980
    PEMBAKUAN KAPASITAS SATUAN PEMBANGKIT DIESEL DAN KAPASITAS
    PUSAT LISTRIK TENAGA DIESEL
   
SPLN 32 : 1980    PEMBAKUAN KAPASITAS SATUAN PEMBANGKIT DIESEL DAN KAPASI
    TAS PUSAT LISTRIK TENAGA DIESEL
   
SPLN 33 : 1980   
   
SPLN 34-1 : 1980    PEDOMAN PENERAPAN PUBLIKASI IEC 34 MESIN LISTRIK YANG BER
    PUTAR
    BAGIAN 1 : PUBLIKASI 34-1 S/D 34-5
   
SPLN 34A : 1980    ROTATING ELECTRICAL MACHINES
    PART 1 : RATING AND PERFORMANCE
   
SPLN 34B : 1980    ROTATING ELECTRICAL MACHINES
    PART 2 : METHODS OF DETERMINING LOSSES AND EFFICIENCY OF
                     ROTATING ELECTRICAL MACHINERY FROM TESTS
                    ( EXCLUDING MACHINES FOR TRACTION VEHICLES )
   
SPLN 34C : 1980    ROTATING ELECTRICAL MACHINES
    PART 3 : RATINGS AND CHARACTERISTICS OF THREE PHASE,  50 HZ
                     TURBINE TYPE MACHINES
   
SPLN 34D : 1980    RECOMMENDATIONS FOR ROTATING ELECTRICAL MACHINERY
    (EXCLUDING MACHINES FOR TRACTION VEHICLES
    PART 4 : METHODS FOR DETERMINING FOR SYNCHRONOUS
                     MACHINE QUANTITIES FROM TESTS
   
SPLN 34E : 1980    ROTATING ELECTRICAL MACHINES
    PART 5 : DEGREES OF PROTECTION BY ENCLOSERS FOR ROTATING
                     MACHINERY
   
SPLN 35 : 1981    PEDOMAN PENERAPAN PUBLIKASI IEC 193 (1965) DAN 193A (1972)
   
   
SPLN 35A : 1980    INTERNATIONAL CODE FOR MODEL ACCEPTANCE TESTS OF HYDRO
    LIC TURBINES
    FIRST SUPPLEMENT TO PUBLICATION 193 (1965)
   
SPLN 38 : 1980    PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA MINYAK
    PELUMAS
   
SPLN 44 : 1981    PEDOMAN PENERAPAN METODA ASME UNTUK ANALISA GAS BUANG
   
SPLN 46-1 : 1981    PEDOMAN PEMBATASAN TINGKAT BISING
    BAGIAN 1 : TINGKAT BISING DI TEMPAT KERJA
   
SPLN 46-2 : 1981    PEDOMAN PEMBATASAN TINGKAT BISING
    BAGIAN 2 : TINGKAT BISING PUSAT LISTRIK TERHADAP LINGKUNGAN
   
SPLN 46-3 : 1982    PEDOMAN PEMBATASAN TINGKAT BISING
    BAGIAN 3 : PEDOMAN PENGUKURAN TINGKAT BISING DI-TEMPAT
                           KERJA DAN TINGKAT BISING LINGKUNGAN
   
SPLN 47-1  S1 : 1984    SUPLEMEN PERTAMA SPLN 47-1 : 1981 PEMBAKUAN PLTD
    BAGIAN 1 : PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
   
SPLN 47-1  : 1981    PEMBAKUAN PLTD
    BAGIAN 1 : PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
   
SPLN 47-2  : 1982    PEMBAKUAN PLTD
    BAGIAN 2 : PLTD BESAR
   
SPLN 47-3  : 1986    PEMBAKUAN PLTD
    BAGIAN 3 : GENERATOR
   
SPLN 47-4  : 1983    PEMBAKUAN PLTD
    BAGIAN 4 : KONTROL DAN PENGAMAN
    A. BAGIAN MEKANIS
         UNTUK PLTD BAKAL, PLTD KECIL DAN  PLTD SEDANG
   
SPLN 47-4  : 1984    PEMBAKUAN PLTD
    BAGIAN 4 : KONTROL DAN PENGAMAN
    C. PLTD BESAR
   
SPLN 47-5  : 1986    PEMBAKUAN PLTD
    BAGIAN 5 : UJI SIAP GUNA
   
SPLN 48  : 1981    PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA BATUBARA
   
   
SPLN 51  : 1982    PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA BAHAN
    BAKAR GAS ALAM
   
SPLN 53  : 1983    PEDOMAN PENERAPAN STANDAR ISO 3744 DAN 3746
    MENENTUKAN TINGKAT DAYA BUNYI SUMBER BISING
   
SPLN 58  : 1984    KOMISIONING PLTG
   
   
SPLN 62-1  : 1986    STANDAR OPERASI PUSAT LISTRIK TENAGA UAP
    BAGIAN SATU : POLA PENGUSAHAAN
   
SPLN 62-2  : 1987    STANDAR OPERASI PUSAT LISTRIK TENAGA UAP
    BAGIAN DUA : FAKTOR-FAKTOR PENGUSAHAAN
   
SPLN 73  : 1987    KOMISIONING JARINGAN
   
SPLN 79  : 1987    STANDAR OPERASI PUSAT LISTRIK TENAGA DIESEL
   
SPLN 80  : 1989    STANDAR OPERASI PUSAT LISTRIK TENAGA GAS
   
SPLN 85  : 1990    KOMISIONING KETEL UAP
   
SPLN 86-2  : 1992    KOMISIONING TURBIN UAP PUSAT LISTRIK
    BAGIAN 2 : PERHITUNGAN UNJUK KERJA TURBIN UAP
   
SPLN 86  : 1990    KOMISIONING TURBIN UAP PUSAT LISTRIK
    BAGIAN 1 : UMUM
   
SPLN 89-1  : 1991    GETARAN MESIN PEMBANGKIT
    BAGIAN 1 : PEMANTAUAN GETARAN MESIN PEMBANGKIT DALAM
                          KONDISI OPERASI NORMAL
   
SPLN 89-2  : 1994    GETARAN MESIN PEMBANGKIT
    BAGIAN 2 : IDENTIFIKASI GETARAN TIDAK NORMAL PADA MESIN
                          PEMBANGKIT
   
SPLN 90-2-1  : 1995    KOMISIONING PLTA
    BAGIAN 2-1 : PEDOMAN PENGUJIAN PRAJALAN TURBIN AIR DAN
                              PERALATAN BANTUNYA
   
SPLN 90  : 1990    KOMISIONING PLTA
   
SPLN 111-1  : 1994    MANAJEMEN PEMELIHARAAN PUSAT LISTRIK
    BAGIAN 1 : UMUM
   
SPLN 111-4  : 1995    MANAJEMEN PEMELIHARAAN PUSAT LISTRIK
    BAGIAN 4 : MANAJEMEN PEMELIHARAAN PLTD
   
SPLN 112  : 1994    AMBANG BATAS KUAT MEDAN LISTRIK DAN INDUKSI MEDAN MAGNIT
    DIBAWAH SALURAN TEGANGAN TINGGI DAN EKSTRA TINGGI
   
SPLN 68-1A : 1986    TINGKAT JAMINAN SISTEM TENAGA LISTRIK
    BAGIAN SATU : SISTEM TENAGA HULU
                                   A. PEMBANGKITAN




BIDANG SCADA        

SPLN 109-1 : 1996    POLA SCADA
    BAGIAN 1 : PEDOMAN DASAR
  
SPLN 109-2 : 1996    POLA SCADA
    BAGIAN 2 : PENGATUR ANTAR REGIONAL
  
SPLN 109-3 : 1996    POLA SCADA
    BAGIAN 3 : PENGATUR WILAYAH
  
SPLN 109-4 : 1996    POLA SCADA
    BAGIAN 4 : PENGATUR REGIONAL
  
SPLN 109-5 : 1996    POLA SCADA
    BAGIAN 5 : PENGATUR DISTRIBUSI
  
SPLN 109-6 : 1996    POLA SCADA
    BAGIAN 6 : PENGATUR SUBREGIONAL