Standar-standar PLN (SPLN) meliputi bidang-bidang:
- Umum
- Transmisi
- Distribusi
- Pembangkitan
- SCADA
BIDANG UMUM | ||
No. | SPLN No. | JUDUL |
1 | SPLN 4 : 1978 | PEMBAGIAN TUGAS KELOMPOK-KELOMPOK PEMBAKUAN |
2 | SPLN 5 : 1978 | TATA TERTIB PEMBAHASAN KONSEP PEMBAKUAN |
3 | SPLN 6 : 1978 | PEDOMAN UNTUK PENYUSUNAN NASKAH STANDAR |
4 | SPLN 29 : 1980 | PENYUSUNAN KONSEP PEMBAKUAN UNTUK PERALATAN LISTRIK |
PRODUKSI DALAM NEGERI | ||
5 | SPLN 36A : 1980 | LOADING TESTS ON OVERHEAD LINE TOWERS |
6 | SPLN 66 : 1986 | STANDAR PERALATAN KESELAMATAN KERJA |
7 | SPLN 66A : 1986 | TERMINOLOGI UNTUK PERKAKAS DAN PERLENGKAPAN YANG |
DIGUNAKAN UNTUK PEKERJAAN BERTEGANGAN | ||
8 | SPLN 67-1A : 1986 | KONDISI SPESIFIK INDONESIA |
BAGIAN SATU : A. KONDISI ALAM | ||
9 | SPLN 67-1B : 1986 | KONDISI SPESIFIK INDONESIA |
BAGIAN SATU : B. DESAIN DAN OPERASI SISTEM | ||
10 | SPLN 67-1C : 1987 | KONDISI SPESIFIK DI INDONESIA |
BAGIAN SATU : C. PUSAT LISTRIK TENAGA TERMAL | ||
11 | SPLN 67-2A : 1986 | KONDISI SPESIFIK INDONESIA |
BAGIAN DUA : A. PEMBANGKIT LISTRIK TENAGA AIR | ||
12 | SPLN 67-2B : 1986 | KONDISI SPESIFIK INDONESIA |
BAGIAN DUA : B. KOMISIONING DAN PENGUJIAN INSTALASI | ||
LISTRIK | ||
13 | SPLN 67-2C : 1986 | KONDISI SPESIFIK INDONESIA |
BAGIAN DUA : C. PENGENDALIAN DAN PENGAWASAN MUTU | ||
14 | SPLN 69-1 : 1986 | STANDARISASI PERALATAN UJI |
BAGIAN SATU : KOMISIONING INSTALASI DAN PENGUJIAN | ||
PERALATAN | ||
15 | SPLN 69-2 : 1987 | STANDARISASI PERALATAN UJI |
BAGIAN DUA : STANDAR PERALATAN UJI | ||
16 | SPLN 70-1 : 1985 | PEMBAKUAN ISTILAH TEKNIK BIDANG KELISTRIKAN |
17 | SPLN 70-2 : 1986 | PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN |
(SERI KEDUA) | ||
18 | SPLN 70-3 : 1987 | PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN |
(SERI KETIGA) | ||
19 | SPLN 70-4 : 1992 | PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN |
(SERI KEEMPAT) | ||
20 | SPLN 70-5 : 1995 | PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN |
(SERI KELIMA) | ||
21 | SPLN 70-6 : 1995 | PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN |
(SERI KEENAM) | ||
22 | SPLN 70-7 : 1995 | PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN |
(SERI KETUJUH) | ||
23 | SPLN 71-1 : 1987 | PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN |
(SERI PERTAMA) | ||
24 | SPLN 71-2 : 1989 | PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN |
(SERI KEDUA) | ||
25 | SPLN 71-3 : 1993 | PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN |
(SERI KETIGA) | ||
26 | SPLN 99 : 1992 | WARNA LAMBANG STANDAR UNTUK DIAGRAM MIMIK |
27 | SPLN 104 : 1993 | WARNA STANDAR |
28 | SPLN 105 : 1995 | PERWAJAHAN PUBLIKASI SPLN |
29 | SPLN 106 : 1993 | TANDA KESELAMATAN KERJA |
30 | SPLN 107 : 1993 | WARNA PIPA DAN TANGKI PUSAT LISTRIK |
BIDANG TRANSMISI
SPLN 2 : 1978 PENTANAHAN NETRAL SISTEM TRANSMISI, SUB-TRANSMISI DAN DISTRIBUSI BESERTA PENGAMANANNYA
SPLN 7 : 1978 PEDOMAN PEMILIHAN TINGKAT ISOLASI TRANSFORMATOR
DAN PENANGKAP PETIR
SPLN 7A : 1978 KOORDINASI ISOLASI BAGIAN 1 : ISTILAH, DEFINISI,PRINSIP DAN KETENTUAN
SPLN 7B : 1978 KOORDINASI ISOLASI BAGIAN 2 : PEDOMAN APLIKASI
SPLN 7C : 1978 LIGHTNING ARRESTER PART 1 : NON LINEAR RESISTOR TYPE ARRESTER FOR AC SYSTEM
SPLN 7D : 1978 RECOMMENDATIONS FOR LIGHTNING ARRESTERS PART 1 : NON LINEAR RESISTOR -TYPE ARRESTERS
SPLN 8-1 : 1991 TRANSFORMATOR TENAGA BAGIAN 1 : UMUM
SPLN 8-2 : 1991 TRANSFORMATOR TENAGA BAGIAN 2 : KENAIKAN SUHU
SPLN 8-3-1 : 1991 TRANSFORMATOR TENAGA BAGIAN 3-1 : TINGKAT ISOLASI DAN UJI DIELEKTRIK JARAK BEBAS LUAR DI UDARA
SPLN 8-3 : 1991 TRANSFORMATOR TENAGA BAGIAN 3 : TINGKAT ISOLASI DAN UJI DIELEKTRIK
SPLN 8-4 : 1991 TRANSFORMATOR TENAGA BAGIAN 4 : SADAPAN DAN HUBUNGAN
SPLN 8-5 : 1991 TRANSFORMATOR TENAGA BAGIAN 5 : KEMAMPUAN MENAHAN HUBUNG SINGKAT
SPLN 9A : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 1 : GENERAL AND DEFINITIONS
SPLN 9B : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 2 : RATING
SPLN 9C : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 3 : DESIGN AND CONSTRUCTION
SPLN 9D : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 4 : TYPE TESTS AND ROUTINE TESTS
SPLN 9E : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 4 : TYPE TESTS AND ROUTINE TESTS
APPENDIX E- : METHODS OF DETERMINING PROSPECTIVE TRANSIENT RECOVERY VOLTAGE WAVES
SPLN 9F : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 5 : RULES FOR THE SELECTION OF CIRCUIT BREAKERS FOR SERVICE
SPLN 9G : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 6 : INFORMATION TO BE GIVEN WITH ENQUIRIES,TENDERS AND ORDERS RULES FOR TRANSPORT, ERECTION AND MAINTENANCE
SPLN 10-1 : 1978 KETENTUAN TENTANG JENIS DAN UKURAN ISOLATOR YANG
DIPILIH
SPLN 10-1A : 1996 ISOLATOR RENTENG JENIS KAP DAN PIN
SPLN 10-1B : 1978 DIMENSI BOLA DAN KOPLING SENDI DARI UNIT (SATUAN)
ISOLATOR RENTENGAN
SPLN 10-1C : 1978 LOCKING DEVICES FOR BALL AND SOCKET COUPLINGS OF
STRING INSULATOR UNITS
PART 1 : DIMENSIONS AND GENERAL RULES
SPLN 10-1D : 1978 LOCKING DEVICES FOR BALL AND SOCKET COUPLINGS OF
STRING INSULATOR UNITS
PART 2 : TESTS
SPLN 10-1E-1 : 1996 ISOLATOR UNTUK SALURAN UDARA DENGAN TEGANGAN
NOMINAL DIATAS 1000 VOLT
BAGIAN 1 : UNIT ISOLATOR KERAMIK ATAU GELAS UNTUK
SISTEM ARUS BOLAK BALIK, DEFINISI ,METODE UJI
DAN KRITERIA SERAH TERIMA.
SPLN 10-1E-2 : 1996 ISOLATOR UNTUK SALURAN UDARA DENGAN TEGANGAN
NOMINAL DIATAS 1000 VOLT
BAGIAN 2 : RENTENGAN ISOLATOR DAN SET ISOLATOR UNTUK
SISTEM ARUS BOLAK BALIK, DEFINISI ,METODE UJI
DAN KRITERIA SERAH TERIMA.
SPLN 10-1F : 1989 PENGUJIAN TEGANGAN IMPULS HUBUNG PADA ISOLATOR
TEGANGAN TINGGI
SPLN 10-2A : 1978 TEST ON INDOOR AND OUTDOOR POST INSULATORS FOR
SYSTEM WITH NOMINAL VOLTAGE GREATER THAN 1000V
SPLN 10-2B : 1978 DIMENSIONS OF INDOOR AND OUTDOOR POST INSULATORS
AND POST INSULATOR UNITS FOR SYSTEMS WITH NOMINAL
VOLTAGES GREATER THAN 1000 V
SPLN 10-3B : 1993 TINGKAT INTENSITAS POLUSI SEHUBUNGAN DENGAN PEDOMAN
PEMILIHAN ISOLATOR
SPLN 10-4A : 1994 ISOLATOR TONGGAK PIN (PIN POST) UNTUK SALURAN UDARA
TEGANGAN MENENGAH 20 kV
SPLN 10-4B : 1995 ISOLATOR TONGGAK SALURAN UNTUK SALURAN UDARA
TEGANGAN MENENGAH 20 kV
SPLN 10-4C : 1997 ISOLATOR PIN UNTUK SALURAN UDARA TEGANGAN MENENGAH
20 kV
SPLN 11A : 1978 HIGH VOLTAGE TEST TECHNIQUES
PART 1 : GENERAL DEFINITIONS AND TEST REQUIREMENTS
SPLN 11B : 1978 HIGH VOLTAGE TEST TECHNIQUES
PART 2 : TEST PROCEDURES
SPLN 11C : 1978 HIGH VOLTAGE TEST TECHNIQUES
PART 3 : MEASURING DEVICES
SPLN 11D : 1978 REKOMENDASI PENGUKURAN TEGANGAN DENGAN MENGGUNA
KAN SELA BOLA (SATU BOLA DITANAHKAN)
SPLN 13 : 1978 KRITERIA DASAR BAGI PERENCANAAN SALURAN UDARA
TEGANGAN TINGGI 66 kV DAN 150 kV
SPLN 15 : 1979 PEDOMAN PEMILIHAN JENIS DAN UKURAN PENGHANTAR
ALUMINIUM BAGI SALURAN UDARA 20 kV, 66 kV dan 150 kV
SPLN 16 : 1979 PEDOMAN PENERAPAN SALURAN UDARA TEGANGAN TINGGI
66 KV DAN 150 KV DENGAN ISOLATOR TONGGAK SALURAN
SPLN 17 : 1979 PEDOMAN PEMBEBANAN TRANSFORMATOR TERENDAM MINYAK
SPLN 17A : 1979 LOADING GUIDE FOR OIL-IMMERSED TRANSFORMERS
SPLN 18A : 1979 ON LOAD TAP CHANGERS
SPLN 18B : 1979 PEDOMAN PENERAPAN PENGUBAH SADAPAN BERBEBAN
SPLN 31 : 1980 TEGANGAN PENGENAL TRANSFORMATOR DAN JANGKAUAN
PENYADAPAN PENGUBAH SADAPAN BERBEBAN PADA SISTEM
66 KV DAN 150 KV
SPLN 37A : 1980 APLICATION GUIDE FOR POWER TRANSFORMERS
SPLN 49-1 : 1982 MINYAK ISOLASI
BAGIAN 1 : PEDOMAN PENERAPAN SPESIFIKASI DAN
PEMELIHARAAN MINYAK ISOLASI
SPLN 49-1A : 1982 SPESIFICATION FOR NEW INSULATING OILS FOR TRANSFORMERS
AND SWITCHGEAR
SPLN 49-1B : 1982 MAINTENANCE AND SUPERVISION GUIDE FOR INSULATING OILS
IN SERVICE
SPLN 49-2 : 1982 MINYAK ISOLASI
BAGIAN 2 : PEDOMAN PENERAPAN METODE IEC UNTUK ANALISA
MINYAK ISOLASI
SPLN 52-1 : 1983 POLA PENGAMANAN SISTEM
BAGIAN 1 : A. SISTEM TRANSMISI 66 KV
SPLN 52-1 : 1983 POLA PENGAMANAN SISTEM
BAGIAN 1 : C. TRANSFORMATOR 150/66 KV, 150/20 KV DAN
66/20 KV
SPLN 52-2 : 1985 POLA PENGAMANAN SISTEM
BAGIAN 2 : GENERATOR
SPLN 52-3 : 1983 POLA PENGAMANAN SISTEM
BAGIAN 3 : SISTEM DISTRIBUSI 6 KV DAN 20 KV
SPLN 61 : 1997 SPESIFIKASI TRANSFORMATOR TENAGA TEGANGAN TINGGI
SPLN 65 : 1985 PETUNJUK PEMILIHAN DAN PENGGUNAAN RELAI STATIS
SPLN 73 : 1987 KOMISIONING JARINGAN
SPLN 78 : 1987 PERHITUNGAN PENGARUH ARUS HUBUNG SINGKAT
SPLN 82-1 : 1991 PEKERJAAN DALAM KEADAAN BERTEGANGAN
BAGIAN 1 : PERATURAN UMUM
SPLN 82-2 : 1991 PEKERJAAN DALAM KEADAAN BERTEGANGAN
BAGIAN 2 : - JARINGAN TEGANGAN RENDAH
- PERSYARATAN KERJA DAN LEMBARAN TEKNIK
PERKAKAS.
SPLN 82-3 : 1993 PEKERJAAN DALAM KEADAAN BERTEGANGAN
BAGIAN 3 : - JARINGAN TEGANGAN MENENGAH
- PERSYARATAN KERJA DAN LEMBARAN TEKNIK
PERKAKAS.
LAMPIRAN
SPLN 82-3 : 1993 LEMBARAN TEKNIK PERKAKAS DAN LEMBARAN TEKNIK-METODE
OPERASI
SPLN 100-3 : 1993 SALURAN UDARA TEGANGAN TINGGI
PEMBEBANAN PENYANGGA SALURAN UDARA
BAGIAN III : PEMBEBANAN KHUSUS
SPLN 112 : 1994 AMBANG BATAS KUAT MEDAN LISTRIK DAN INDUKSI MEDAN
MAGNIT DIBAWAH SALURAN TEGANGAN TINGGI DAN EKSTRA
TINGGI
SPLN 119 : 1996 TIANG BETON PRATEKAN UNTUK SALURAN UDARA TEGANGAN
TINGGI 70 KV DAN 150 KV
SPLN 120 : 1996 TIANG BAJA UNTUK SALURAN UDARA TEGANGAN TINGGI 70 KV
DAN 150 KV
SPLN 121 : 1996 KONSTRUKSI SALURAN UDARA TEGANGAN TINGGI 70 KV DAN
150 KV DENGAN TIANG BETON/BAJA
SPLN 68-1B : 1986 TINGKAT JAMINAN SISTEM TENAGA LISTRIK
BAGIAN SATU : SISTEM TENAGA HULU
A. TRANSMISI
BIDANG DISTRIBUSI
SPLN 1 : 1995 TEGANGAN-TEGANGAN STANDAR
SPLN 3 :1978 PENTANAHAN JARING TEGANGAN RENDAH PLN DAN PENTANAHAN INSTALASI
SPLN 12 : 1978 PEDOMAN PENERAPAN SISTEM DISTRIBUSI 20 KV FASA-TIGA, 4-KAWAT
SPLN 14 : 1979 KRITERIA DASAR BAGI PERENCANAAN SALURAN UDARA TEGANGAN MENENGAH 20 KV SERTA TEGANGAN TINGGI 66 KV DAN 150 KV
SPLN 26 : 1980 PEDOMAN PENERAPAN SISTEM DISTRIBUSI 20 KV FASA-TIGA, 3-KAWAT DENGAN TAHANAN RENDAH DAN TAHANAN TINGGI
SPLN 27 : 1980 PENTANAHAN INSTALASI KONSUMEN UNTUK PELISTRIKAN DESA
SPLN 39-1 :1981 PENGUJIAN KABEL LISTRIK
SPLN 39-2 :1981 PENGUJIAN KABEL LISTRIK
- Pengujian Latu Listrik
- Pengujian retak pada suhu rendah untuk isolasi dan selubung PVC
SPLN 40-1 : 1981 TANDA TANDA PENGENAL UNTUK KAWAT DAN KABEL LISTRIK BERISOLASI
SPLN 41-1 :1991 PERSYARATAN PENGHANTAR TEMBAGA DAN ALUMINIUM UNTUK KABEL LISTRIK BERISOLASI
SPLN 41-2 :1981 PERSYARATAN KOMPON PVC UNTUK KAWAT DAN KABEL LISTRIK TEGANGAN NOMINAL 0,6/1 KV
SPLN 41-2 : 1991 PERSYARATAN KOMPON PVC UNTUK ISOLASI DAN SELUBUNG KABEL LISTRIK
SPLN 41-3 : 1981 PERSYARATAN KOMPON KARET UNTUK KAWAT DAN KABEL LISTRIK TEGANGAN NOMINAL S/D 1000 V
SPLN 41-4 : 1981 HANTARAN TEMBAGA TELANJANG JENIS SETENGAH KERAS (BCC 1/2 H)
SPLN 41-5 : 1981 HANTARAN TEMBAGA TELANJANG JENIS KERAS (BCC H)
SPLN 41-6 : 1981 HANTARAN ALUMINIUM (AAC)
SPLN 41-7 : 1981 HANTARAN ALUMINIUM BERPENGUAT BAJA (ACSR)
SPLN 41-8 : 1981 HANTARAN ALUMINIUM CAMPURAN (AAAC)
SPLN 41-9 : 1986 PERSYARATAN KOMPON XLPE UNTUK KABEL BERTEGANGAN PENGENAL DIATAS 1 kV S/D 30 kV
SPLN 41-10 : 1991 PENGHANTAR ALUMINIUM PADUAN BERSELUBUNG POLIETILEN IKAT SILANG (AAAC-S)
SPLN 41-11 :1992 PERSYARATAN ISOLASI DAN SELUBUNG PE KABEL LISTRIK
SPLN 42-1 : 1991 KAWAT BERISOLASI PVC TEGANGAN PENGENAL 450/750 V (NYA)
SPLN 42-2 : 1992 KABEL BERISOLASI DAN BERSELUBUNG PVC TEGANGAN PENGENAL 300/500 VOLT (NYM)
SPLN 42-3 : 1992 KAWAT FLEKSIBEL BERISOLASI PVC TEGANGAN PENGENAL 450/750 V (NYAF)
SPLN 42-4 : 1992 KAWAT FLEKSIBEL KEMBAR DUA DAN TIGA BERISOLASI PVC TEGANGAN PENGENAL 300/300 VOLT (NYZ/NYD)
SPLN 42-5 : 1981 KAWAT BERISOLASI KARET TEGANGAN NOMINAL 1000 V (NGA)
SPLN 42-6-1 : 1991 KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
TEGANGAN PENGENAL 300/300 V UNTUK BEBAN MEKANIS RINGAN (NYLHYrd/NYLHYf1)
SPLN 42-6-2 : 1991 KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
TEGANGAN PENGENAL 300/500 V UNTUK BEBAN MEKANIS SEDANG (NYLHYrd/NYLHYf1)
SPLN 42-6-3 : 1991 KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
TEGANGAN PENGENAL 450/750 V UNTUK BEBAN MEKANIS BERAT (NYSHY)
SPLN 42-7 : 1992 KABEL PIPIH BERISOLASI DAN BERSELUBUNG PVC TEGANGAN PENGENAL 300/500 V (NYIFY)
SPLN 42-8 : 1981 NYMT PVC INSULATED SELF SUPPORTING AERIAL CABLE WITH BLACK OUTER SHEATH RATED VOLTAGE 500 V (UNOFFICIAL)
SPLN 42-9 : 1981 KABEL BERISOLASI DAN BERSELUBUNG PVC TEGANGAN NOMINAL 500 V (NYM OVAL)
SPLN 42-10 : 1993 KABEL PILIN UDARA TEGANGAN PENGENAL 0,6/1 KV (NFA2X-T/NFA2X/NF2X)
SPLN 42-11 : 1991 KABEL SAMBUNGAN RUMAH BERISOLASI XLPE DAN B ERSELUBUNG PVC DENGAN PENGHANTAR KONSENTRIS TEMBAGA TEGANGAN PENGENAL 0,6/1 KV (N2XCY-SR/NA2XCY-SR)
SPLN 43-1 : 1994 KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, TEGANGAN PENGENAL 0,6/1 KV (NYY/NAYY)
SPLN 43-2 : 1994 KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, BERPERISAI KAWAT BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (NYFGbY/NAYFGbY/NYRGbY/NAYRGbY)
SPLN 43-3 :1994 KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, BERPERISAI PITA BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (NYBY/NAYBY)
SPLN 3 :1978 PENTANAHAN JARING TEGANGAN RENDAH PLN DAN PENTANAHAN INSTALASI
SPLN 12 : 1978 PEDOMAN PENERAPAN SISTEM DISTRIBUSI 20 KV FASA-TIGA, 4-KAWAT
SPLN 14 : 1979 KRITERIA DASAR BAGI PERENCANAAN SALURAN UDARA TEGANGAN MENENGAH 20 KV SERTA TEGANGAN TINGGI 66 KV DAN 150 KV
SPLN 26 : 1980 PEDOMAN PENERAPAN SISTEM DISTRIBUSI 20 KV FASA-TIGA, 3-KAWAT DENGAN TAHANAN RENDAH DAN TAHANAN TINGGI
SPLN 27 : 1980 PENTANAHAN INSTALASI KONSUMEN UNTUK PELISTRIKAN DESA
SPLN 39-1 :1981 PENGUJIAN KABEL LISTRIK
SPLN 39-2 :1981 PENGUJIAN KABEL LISTRIK
- Pengujian Latu Listrik
- Pengujian retak pada suhu rendah untuk isolasi dan selubung PVC
SPLN 40-1 : 1981 TANDA TANDA PENGENAL UNTUK KAWAT DAN KABEL LISTRIK BERISOLASI
SPLN 41-1 :1991 PERSYARATAN PENGHANTAR TEMBAGA DAN ALUMINIUM UNTUK KABEL LISTRIK BERISOLASI
SPLN 41-2 :1981 PERSYARATAN KOMPON PVC UNTUK KAWAT DAN KABEL LISTRIK TEGANGAN NOMINAL 0,6/1 KV
SPLN 41-2 : 1991 PERSYARATAN KOMPON PVC UNTUK ISOLASI DAN SELUBUNG KABEL LISTRIK
SPLN 41-3 : 1981 PERSYARATAN KOMPON KARET UNTUK KAWAT DAN KABEL LISTRIK TEGANGAN NOMINAL S/D 1000 V
SPLN 41-4 : 1981 HANTARAN TEMBAGA TELANJANG JENIS SETENGAH KERAS (BCC 1/2 H)
SPLN 41-5 : 1981 HANTARAN TEMBAGA TELANJANG JENIS KERAS (BCC H)
SPLN 41-6 : 1981 HANTARAN ALUMINIUM (AAC)
SPLN 41-7 : 1981 HANTARAN ALUMINIUM BERPENGUAT BAJA (ACSR)
SPLN 41-8 : 1981 HANTARAN ALUMINIUM CAMPURAN (AAAC)
SPLN 41-9 : 1986 PERSYARATAN KOMPON XLPE UNTUK KABEL BERTEGANGAN PENGENAL DIATAS 1 kV S/D 30 kV
SPLN 41-10 : 1991 PENGHANTAR ALUMINIUM PADUAN BERSELUBUNG POLIETILEN IKAT SILANG (AAAC-S)
SPLN 41-11 :1992 PERSYARATAN ISOLASI DAN SELUBUNG PE KABEL LISTRIK
SPLN 42-1 : 1991 KAWAT BERISOLASI PVC TEGANGAN PENGENAL 450/750 V (NYA)
SPLN 42-2 : 1992 KABEL BERISOLASI DAN BERSELUBUNG PVC TEGANGAN PENGENAL 300/500 VOLT (NYM)
SPLN 42-3 : 1992 KAWAT FLEKSIBEL BERISOLASI PVC TEGANGAN PENGENAL 450/750 V (NYAF)
SPLN 42-4 : 1992 KAWAT FLEKSIBEL KEMBAR DUA DAN TIGA BERISOLASI PVC TEGANGAN PENGENAL 300/300 VOLT (NYZ/NYD)
SPLN 42-5 : 1981 KAWAT BERISOLASI KARET TEGANGAN NOMINAL 1000 V (NGA)
SPLN 42-6-1 : 1991 KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
TEGANGAN PENGENAL 300/300 V UNTUK BEBAN MEKANIS RINGAN (NYLHYrd/NYLHYf1)
SPLN 42-6-2 : 1991 KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
TEGANGAN PENGENAL 300/500 V UNTUK BEBAN MEKANIS SEDANG (NYLHYrd/NYLHYf1)
SPLN 42-6-3 : 1991 KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
TEGANGAN PENGENAL 450/750 V UNTUK BEBAN MEKANIS BERAT (NYSHY)
SPLN 42-7 : 1992 KABEL PIPIH BERISOLASI DAN BERSELUBUNG PVC TEGANGAN PENGENAL 300/500 V (NYIFY)
SPLN 42-8 : 1981 NYMT PVC INSULATED SELF SUPPORTING AERIAL CABLE WITH BLACK OUTER SHEATH RATED VOLTAGE 500 V (UNOFFICIAL)
SPLN 42-9 : 1981 KABEL BERISOLASI DAN BERSELUBUNG PVC TEGANGAN NOMINAL 500 V (NYM OVAL)
SPLN 42-10 : 1993 KABEL PILIN UDARA TEGANGAN PENGENAL 0,6/1 KV (NFA2X-T/NFA2X/NF2X)
SPLN 42-11 : 1991 KABEL SAMBUNGAN RUMAH BERISOLASI XLPE DAN B ERSELUBUNG PVC DENGAN PENGHANTAR KONSENTRIS TEMBAGA TEGANGAN PENGENAL 0,6/1 KV (N2XCY-SR/NA2XCY-SR)
SPLN 43-1 : 1994 KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, TEGANGAN PENGENAL 0,6/1 KV (NYY/NAYY)
SPLN 43-2 : 1994 KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, BERPERISAI KAWAT BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (NYFGbY/NAYFGbY/NYRGbY/NAYRGbY)
SPLN 43-3 :1994 KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, BERPERISAI PITA BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (NYBY/NAYBY)
SPLN 43-4 : 1994 KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, DENGAN PENGHANTAR KONSENTRIS TEMBAGA TEGANGAN PENGENAL 0,6/1 KV (NYCY/NAYCY)
SPLN 43-5-1 : 1995 KABEL PILIN TANAH BERISOLASI XLPE DAN BERSELUBUNG PE/PVC DENGAN TEGANGAN PENGENAL 12/20 (24) KV
SPLN 43-5-2 : 1995 KABEL PILIN UDARA BERISOLASI XLPE DAN BERSELUBUNG PVC BERPENGGANTUNG KAWAT BAJA DENGAN TEGANGAN PENGENAL 12/20 (24) KV
SPLN 43-5-3 :1995 KABEL TANAH INTI TUNGGAL BERISOLASI XLPE DAN BERSELUBUNG PE/PVC DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
SPLN 43-5-4 : 1995 KABEL TANAH INTI TIGA BERISOLASI XLPE DAN BERSELUBUNG PE/PVC DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
SPLN 43-5-5 : 1995 KABEL TANAH INTI TUNGGAL BERISOLASI XLPE DAN BERSELUBUNG PE/PVC BERPENGHANTAR KONSENTRIS DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
SPLN 43-5-6 : 1995 KABEL TANAH INTI TIGA BERISOLASI XLPE DAN BERSELUBUNG PE/PVC BERPENGHANTAR KONSENTRIS DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
SPLN 43-6 : 1994 KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC TEGANGAN PENGENAL 0,6/1 KV (N2XY/NA2XY)
SPLN 43-7 : 1994 KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC BERPERISAI KAWAT BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (N2XFGbY/NA2XFGbY/N2XRGbY/NA2XRGbY)
SPLN 43-8 : 1994 KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC BERPERISAI PITA BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (N2XBY/NA2XBY)
SPLN 50 : 1997 SPESIFIKASI TRANSFORMATOR DISTRIBUSI
SPLN 54 : 1983 STANDAR TIANG BAJA
SPLN 55 : 1990 ALAT PENGUKUR, PEMBATAS DAN PERLENGKAPANNYA
- LAMPIRAN D :
APP TIPE KHUSUS II A S/D II F DGN TUTUP PELINDUNG
SPLN 56-1 : 1993 SAMBUNGAN TENAGA LISTRIK TEGANGAN RENDAH (SLTR)
SPLN 56-2 : 1994 SAMBUNGAN TENAGA LISTRIK TEGANGAN MENENGAH
(SLTM)
SPLN 56-3-1 : 1996 SAMBUNGAN TENAGA LISTRIK TEGANGAN MENENGAH
DIATAS 8 MVA S/D 60 MVA
BAGIAN 1 : SALURAN KABEL DIBAWAH TANAH
SPLN 56 : 1984 SAMBUNGAN LISTRIK
SPLN 57-1 : 1991 KWH METER ARUS BOLAK BALIK
KELAS 0,5 ; 1 DAN 2
BAGIAN 1 : PASANGAN DALAM
SPLN 57-2 : 1993 KETENTUAN UJI TAMBAHAN UNTUK KWH METER PASANGAN
LUAR
SPLN 57-3 : 1993 METER STATIK ARUS BOLAK BALIK UNTUK ENERGI AKTIF
(KELAS 0,2S DAN 0,5S)
SPLN 57-4 : 1994 METER STATIS ENERGI AKTIF ARUS BOLAK BALIK (KELAS 1
DAN 2 )
SPLN 59 : 1985 KEANDALAN PADA SISTEM DISTRIBUSI 20 kVdan 6 kV
SPLN 60-1 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
SPLN 60-2 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 2 : PROSEDUR SALING BANDING SEL STANDAR DAN
RESISTOR STANDAR.
SPLN 60-3 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 3 : PROSEDUR UJI INSTRUMEN UKUR ENERGI LISTRIK
SPLN 60-4 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 4 : PROSEDUR UJI PENUNJUK KEBUTUHAN MAKSIMUM
SPLN 60-5 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 5 : PROSEDUR UJI PERLENGKAPAN UJI METER ENERGI
LISTRIK
SPLN 60-6 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 6 : PROSEDUR UJI INSTRUMEN UKUR LISTRIK PENUN
JUK LANGSUNG
SPLN 60-7 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 7 : PROSEDUR UJI TRANSFORMATOR INSTRUMEN
SPLN 60 : 1985 STANDARISASI KAMAR TERA
SPLN 63 : 1991 INSPEKSI PENERIMAAN METER KILOWATTJAM ARUS BOLAK
BALIK KELAS 2
SPLN 64 : 1985 PETUNJUK PEMILIHAN DAN PENGGUNAAN PELEBUR PADA
SISTEM DISTRIBUSI TEGANGAN MENENGAH
SPLN 72 : 1987 SPESIFIKASI DESAIN UNTUK JARINGAN TEGANGAN MENENGAH
DAN JARINGAN TEGANGAN RENDAH
SPLN 74 : 1987 STANDAR LISTRIK PEDESAAN
SPLN 75 : 1987 GANGGUAN PADA SISTEM SUPLAI YANG DIAKIBATKAN OLEH
PEMANFAAT LISTRIK DAN PERLENGKAPAN SERUPA
SPLN 76 : 1987 TRANSFORMATOR ARUS
SPLN 77 : 1987 TRANSFORMATOR TEGANGAN
SPLN 83 : 1991 LENGKAPAN SAMBUNGAN RUMAH DENGAN SALURAN UDARA
BERISOLASI
SPLN 84 : 1992 KONEKTOR TEMBUS KEDAP AIR UNTUK KABEL PILIN UDARA
TEGANGAN RENDAH
SPLN 87 : 1991 STANDAR KONSTRUKSI LISTRIK PEDESAAN
SPLN 88 : 1991 PEMBUMIAN NETRAL SISTEM 20 KV DENGAN LEBIH DARI SATU
SUMBER
SPLN 91-1 : 1992 SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
BAGIAN 1 : PERSYARATAN UMUM
SPLN 91-2 : 1994 SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
BAGIAN 2 : DIAMETER LUAR PIPA DAN ULIR
SPLN 91-3 : 1994 SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
BAGIAN 3 : PERSYARATAN KHUSUS PIPA LOGAM
SPLN 91-4 : 1994 SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
BAGIAN 4 : PERSYARATAN KHUSUS PIPA LISTRIK ISOLASI KAKU
RATA
SPLN 91-5 : 1995 SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
BAGIAN 5 : PERSYARATAN KHUSUS PIPA LISTRIK FLEKSIBEL
SPLN 93 : 1991 TIANG BETON PRATEKAN UNTUK JARINGAN DISTRIBUSI
SPLN 94 : 1993 METER VAR - JAM (ENERGI REAKTIF)
SPLN 95 : 1994 TRANSFORMATOR DENGAN PENGAMAN SENDIRI FASE
TUNGGAL UNTUK JARINGAN SISTEM FASE TIGA 4 - KAWAT
SPLN 96 : 1993 PERLENGKAPAN UJI UNTUK METER ENERGI LISTRIK
SPLN 97 : 1993 ALAT PENUNJUK KEBUTUHAN DAYA MAKSIMUM KELAS 1
SPLN 98 : 1992 LENGKAPAN PEGANG KABEL PILIN SALURAN UDARA TEGANGAN
RENDAH
SPLN 101 : 1992 KONEKTOR ALUR PARALEL UNTUK PENGHANTAR TELANJANG
SPLN 102 : 1993 ELEKTRODA BUMI JENIS BATANG BULAT BERLAPIS TEMBAGA
SPLN 103 : 1993 SAKLAR WAKTU UNTUK KONTROL TARIF DAN KENDALI BEBAN
SPLN 108 : 1993 PEMUTUS TENAGA MINI UNTUK PEMBATAS DAN PENGAMAN
ARUS LEBIH UNTUK INSTALASI GEDUNG DAN RUMAH
SPLN 114 : 1993 BLOK TERMINAL
SPLN 115 : 1995 TIANG KAYU UNTUK JARINGAN DISTRIBUSI
SPLN 118-3-1 : 1996 PERANGKAT HUBUNG BAGI
BAGIAN 3-1 : SPESIFIKASI PERANGKAT HUBUNG BAGI
TEGANGAN RENDAH GARDU DISTRIBUSI
SPLN 118-4-1 : 1996 PERANGKAT HUBUNG BAGI
BAGIAN 4-1 : SPESIFIKASI PERANGKAT HUBUNG BAGI
TEGANGAN MENENGAH GARDU DISTRIBUSI
SPLN D3.002-1 : 2007 SPESIFIKASI TRANSFORMATOR DISTRIBUSI
BAGAIAN 1 : TRANSFORMATOR FASE TIGA, 20 KV-400V &
TRANSFORMATOR FASE TUNGGAL, 20 KV-231 DAN
20/Ö3 KV-231 V
SPLN 68-2 : 1986 TINGKAT JAMINAN SISTEM TENAGA LISTRIK
BAGIAN DUA : SISTEM DISTRIBUSI
BIDANG PEMBANGKITAN
SPLN 19 : 1979 PEMBAKUAN PERALATAN LABORATORIUM PLTU
SPLN 20 : 1980 PEDOMAN PENERAPAN UNTUK KOMISIONING, PENGUSAHAAN
DAN PEMELIHARAN TURBIN AIR
SPLN 20A : 1978 GUIDE FOR COMISSIONING, OPERATION AND MAINTENANCE OF
HYDROLIC TURBINES
SPLN 21A : 1980 INTERNATIONAL CODE FOR THE FIELD ACCEPTANCE TESTS OF
HYDROLIC TURBINES
SPLN 22 : 1980 IKHTISAR PERENCANAAN DAN HAL-HAL YANG PERLU DIPERHATI
PADA BLOK PONDASI UNTUK MESIN DIESEL MENURUT BSI CP
2021 : PART 1
SPLN 23A : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - DEFINITIONS
OF LOCATIONS ON AN ENGINE
SPLN 23B : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - VOCABULARY
SPLN 23C : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 1 : STANDARD REFERENCE CONDITIONS AND DECLARATIONS
OF POWER, FUEL CONSUMPTION AND LUBRICATING OIL
CONSUMPTION
SPLN 23D : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 2 : TEST METHODS
SPLN 23E : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 3 : TEST MEASUMENTS
SPLN 23F : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 4 : SPEED GOVERNING
SPLN 23G : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - DESIGNATION
OF THE DIRECTION OF ROTATION
SPLN 23H : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - DESIGNATION
OF THE CYLINDERS
SPLN 24 : 1980 GUIDE FOR COMISSIONING, OPERATION AND MAINTENANCE OF
DIESEL ENGINES
SPLN 25 : 1980 PEDOMAN PENERAPAN UNTUK KOMISIONING, PENGUSAHAAN DAN
PEMELIHARAAN MESIN DIESEL.
SPLN 30 : 1980 PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA KIMIA AIR
SPLN 32 S1 : 1984 SUPLEMEN PERTAMA SPLN 32 1980
PEMBAKUAN KAPASITAS SATUAN PEMBANGKIT DIESEL DAN KAPASITAS
PUSAT LISTRIK TENAGA DIESEL
SPLN 32 : 1980 PEMBAKUAN KAPASITAS SATUAN PEMBANGKIT DIESEL DAN KAPASI
TAS PUSAT LISTRIK TENAGA DIESEL
SPLN 33 : 1980
SPLN 34-1 : 1980 PEDOMAN PENERAPAN PUBLIKASI IEC 34 MESIN LISTRIK YANG BER
PUTAR
BAGIAN 1 : PUBLIKASI 34-1 S/D 34-5
SPLN 34A : 1980 ROTATING ELECTRICAL MACHINES
PART 1 : RATING AND PERFORMANCE
SPLN 34B : 1980 ROTATING ELECTRICAL MACHINES
PART 2 : METHODS OF DETERMINING LOSSES AND EFFICIENCY OF
ROTATING ELECTRICAL MACHINERY FROM TESTS
( EXCLUDING MACHINES FOR TRACTION VEHICLES )
SPLN 34C : 1980 ROTATING ELECTRICAL MACHINES
PART 3 : RATINGS AND CHARACTERISTICS OF THREE PHASE, 50 HZ
TURBINE TYPE MACHINES
SPLN 34D : 1980 RECOMMENDATIONS FOR ROTATING ELECTRICAL MACHINERY
(EXCLUDING MACHINES FOR TRACTION VEHICLES
PART 4 : METHODS FOR DETERMINING FOR SYNCHRONOUS
MACHINE QUANTITIES FROM TESTS
SPLN 34E : 1980 ROTATING ELECTRICAL MACHINES
PART 5 : DEGREES OF PROTECTION BY ENCLOSERS FOR ROTATING
MACHINERY
SPLN 35 : 1981 PEDOMAN PENERAPAN PUBLIKASI IEC 193 (1965) DAN 193A (1972)
SPLN 35A : 1980 INTERNATIONAL CODE FOR MODEL ACCEPTANCE TESTS OF HYDRO
LIC TURBINES
FIRST SUPPLEMENT TO PUBLICATION 193 (1965)
SPLN 38 : 1980 PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA MINYAK
PELUMAS
SPLN 44 : 1981 PEDOMAN PENERAPAN METODA ASME UNTUK ANALISA GAS BUANG
SPLN 46-1 : 1981 PEDOMAN PEMBATASAN TINGKAT BISING
BAGIAN 1 : TINGKAT BISING DI TEMPAT KERJA
SPLN 46-2 : 1981 PEDOMAN PEMBATASAN TINGKAT BISING
BAGIAN 2 : TINGKAT BISING PUSAT LISTRIK TERHADAP LINGKUNGAN
SPLN 46-3 : 1982 PEDOMAN PEMBATASAN TINGKAT BISING
BAGIAN 3 : PEDOMAN PENGUKURAN TINGKAT BISING DI-TEMPAT
KERJA DAN TINGKAT BISING LINGKUNGAN
SPLN 47-1 S1 : 1984 SUPLEMEN PERTAMA SPLN 47-1 : 1981 PEMBAKUAN PLTD
BAGIAN 1 : PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
SPLN 47-1 : 1981 PEMBAKUAN PLTD
BAGIAN 1 : PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
SPLN 47-2 : 1982 PEMBAKUAN PLTD
BAGIAN 2 : PLTD BESAR
SPLN 47-3 : 1986 PEMBAKUAN PLTD
BAGIAN 3 : GENERATOR
SPLN 47-4 : 1983 PEMBAKUAN PLTD
BAGIAN 4 : KONTROL DAN PENGAMAN
A. BAGIAN MEKANIS
UNTUK PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
SPLN 47-4 : 1984 PEMBAKUAN PLTD
BAGIAN 4 : KONTROL DAN PENGAMAN
C. PLTD BESAR
SPLN 47-5 : 1986 PEMBAKUAN PLTD
BAGIAN 5 : UJI SIAP GUNA
SPLN 48 : 1981 PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA BATUBARA
SPLN 51 : 1982 PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA BAHAN
BAKAR GAS ALAM
SPLN 53 : 1983 PEDOMAN PENERAPAN STANDAR ISO 3744 DAN 3746
MENENTUKAN TINGKAT DAYA BUNYI SUMBER BISING
SPLN 58 : 1984 KOMISIONING PLTG
SPLN 62-1 : 1986 STANDAR OPERASI PUSAT LISTRIK TENAGA UAP
BAGIAN SATU : POLA PENGUSAHAAN
SPLN 62-2 : 1987 STANDAR OPERASI PUSAT LISTRIK TENAGA UAP
BAGIAN DUA : FAKTOR-FAKTOR PENGUSAHAAN
SPLN 73 : 1987 KOMISIONING JARINGAN
SPLN 79 : 1987 STANDAR OPERASI PUSAT LISTRIK TENAGA DIESEL
SPLN 80 : 1989 STANDAR OPERASI PUSAT LISTRIK TENAGA GAS
SPLN 85 : 1990 KOMISIONING KETEL UAP
SPLN 86-2 : 1992 KOMISIONING TURBIN UAP PUSAT LISTRIK
BAGIAN 2 : PERHITUNGAN UNJUK KERJA TURBIN UAP
SPLN 86 : 1990 KOMISIONING TURBIN UAP PUSAT LISTRIK
BAGIAN 1 : UMUM
SPLN 89-1 : 1991 GETARAN MESIN PEMBANGKIT
BAGIAN 1 : PEMANTAUAN GETARAN MESIN PEMBANGKIT DALAM
KONDISI OPERASI NORMAL
SPLN 89-2 : 1994 GETARAN MESIN PEMBANGKIT
BAGIAN 2 : IDENTIFIKASI GETARAN TIDAK NORMAL PADA MESIN
PEMBANGKIT
SPLN 90-2-1 : 1995 KOMISIONING PLTA
BAGIAN 2-1 : PEDOMAN PENGUJIAN PRAJALAN TURBIN AIR DAN
PERALATAN BANTUNYA
SPLN 90 : 1990 KOMISIONING PLTA
SPLN 111-1 : 1994 MANAJEMEN PEMELIHARAAN PUSAT LISTRIK
BAGIAN 1 : UMUM
SPLN 111-4 : 1995 MANAJEMEN PEMELIHARAAN PUSAT LISTRIK
BAGIAN 4 : MANAJEMEN PEMELIHARAAN PLTD
SPLN 112 : 1994 AMBANG BATAS KUAT MEDAN LISTRIK DAN INDUKSI MEDAN MAGNIT
DIBAWAH SALURAN TEGANGAN TINGGI DAN EKSTRA TINGGI
SPLN 68-1A : 1986 TINGKAT JAMINAN SISTEM TENAGA LISTRIK
BAGIAN SATU : SISTEM TENAGA HULU
A. PEMBANGKITAN
SPLN 20 : 1980 PEDOMAN PENERAPAN UNTUK KOMISIONING, PENGUSAHAAN
DAN PEMELIHARAN TURBIN AIR
SPLN 20A : 1978 GUIDE FOR COMISSIONING, OPERATION AND MAINTENANCE OF
HYDROLIC TURBINES
SPLN 21A : 1980 INTERNATIONAL CODE FOR THE FIELD ACCEPTANCE TESTS OF
HYDROLIC TURBINES
SPLN 22 : 1980 IKHTISAR PERENCANAAN DAN HAL-HAL YANG PERLU DIPERHATI
PADA BLOK PONDASI UNTUK MESIN DIESEL MENURUT BSI CP
2021 : PART 1
SPLN 23A : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - DEFINITIONS
OF LOCATIONS ON AN ENGINE
SPLN 23B : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - VOCABULARY
SPLN 23C : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 1 : STANDARD REFERENCE CONDITIONS AND DECLARATIONS
OF POWER, FUEL CONSUMPTION AND LUBRICATING OIL
CONSUMPTION
SPLN 23D : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 2 : TEST METHODS
SPLN 23E : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 3 : TEST MEASUMENTS
SPLN 23F : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 4 : SPEED GOVERNING
SPLN 23G : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - DESIGNATION
OF THE DIRECTION OF ROTATION
SPLN 23H : 1980 RECIPROCATING INTERNAL COMBUSTION ENGINES - DESIGNATION
OF THE CYLINDERS
SPLN 24 : 1980 GUIDE FOR COMISSIONING, OPERATION AND MAINTENANCE OF
DIESEL ENGINES
SPLN 25 : 1980 PEDOMAN PENERAPAN UNTUK KOMISIONING, PENGUSAHAAN DAN
PEMELIHARAAN MESIN DIESEL.
SPLN 30 : 1980 PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA KIMIA AIR
SPLN 32 S1 : 1984 SUPLEMEN PERTAMA SPLN 32 1980
PEMBAKUAN KAPASITAS SATUAN PEMBANGKIT DIESEL DAN KAPASITAS
PUSAT LISTRIK TENAGA DIESEL
SPLN 32 : 1980 PEMBAKUAN KAPASITAS SATUAN PEMBANGKIT DIESEL DAN KAPASI
TAS PUSAT LISTRIK TENAGA DIESEL
SPLN 33 : 1980
SPLN 34-1 : 1980 PEDOMAN PENERAPAN PUBLIKASI IEC 34 MESIN LISTRIK YANG BER
PUTAR
BAGIAN 1 : PUBLIKASI 34-1 S/D 34-5
SPLN 34A : 1980 ROTATING ELECTRICAL MACHINES
PART 1 : RATING AND PERFORMANCE
SPLN 34B : 1980 ROTATING ELECTRICAL MACHINES
PART 2 : METHODS OF DETERMINING LOSSES AND EFFICIENCY OF
ROTATING ELECTRICAL MACHINERY FROM TESTS
( EXCLUDING MACHINES FOR TRACTION VEHICLES )
SPLN 34C : 1980 ROTATING ELECTRICAL MACHINES
PART 3 : RATINGS AND CHARACTERISTICS OF THREE PHASE, 50 HZ
TURBINE TYPE MACHINES
SPLN 34D : 1980 RECOMMENDATIONS FOR ROTATING ELECTRICAL MACHINERY
(EXCLUDING MACHINES FOR TRACTION VEHICLES
PART 4 : METHODS FOR DETERMINING FOR SYNCHRONOUS
MACHINE QUANTITIES FROM TESTS
SPLN 34E : 1980 ROTATING ELECTRICAL MACHINES
PART 5 : DEGREES OF PROTECTION BY ENCLOSERS FOR ROTATING
MACHINERY
SPLN 35 : 1981 PEDOMAN PENERAPAN PUBLIKASI IEC 193 (1965) DAN 193A (1972)
SPLN 35A : 1980 INTERNATIONAL CODE FOR MODEL ACCEPTANCE TESTS OF HYDRO
LIC TURBINES
FIRST SUPPLEMENT TO PUBLICATION 193 (1965)
SPLN 38 : 1980 PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA MINYAK
PELUMAS
SPLN 44 : 1981 PEDOMAN PENERAPAN METODA ASME UNTUK ANALISA GAS BUANG
SPLN 46-1 : 1981 PEDOMAN PEMBATASAN TINGKAT BISING
BAGIAN 1 : TINGKAT BISING DI TEMPAT KERJA
SPLN 46-2 : 1981 PEDOMAN PEMBATASAN TINGKAT BISING
BAGIAN 2 : TINGKAT BISING PUSAT LISTRIK TERHADAP LINGKUNGAN
SPLN 46-3 : 1982 PEDOMAN PEMBATASAN TINGKAT BISING
BAGIAN 3 : PEDOMAN PENGUKURAN TINGKAT BISING DI-TEMPAT
KERJA DAN TINGKAT BISING LINGKUNGAN
SPLN 47-1 S1 : 1984 SUPLEMEN PERTAMA SPLN 47-1 : 1981 PEMBAKUAN PLTD
BAGIAN 1 : PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
SPLN 47-1 : 1981 PEMBAKUAN PLTD
BAGIAN 1 : PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
SPLN 47-2 : 1982 PEMBAKUAN PLTD
BAGIAN 2 : PLTD BESAR
SPLN 47-3 : 1986 PEMBAKUAN PLTD
BAGIAN 3 : GENERATOR
SPLN 47-4 : 1983 PEMBAKUAN PLTD
BAGIAN 4 : KONTROL DAN PENGAMAN
A. BAGIAN MEKANIS
UNTUK PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
SPLN 47-4 : 1984 PEMBAKUAN PLTD
BAGIAN 4 : KONTROL DAN PENGAMAN
C. PLTD BESAR
SPLN 47-5 : 1986 PEMBAKUAN PLTD
BAGIAN 5 : UJI SIAP GUNA
SPLN 48 : 1981 PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA BATUBARA
SPLN 51 : 1982 PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA BAHAN
BAKAR GAS ALAM
SPLN 53 : 1983 PEDOMAN PENERAPAN STANDAR ISO 3744 DAN 3746
MENENTUKAN TINGKAT DAYA BUNYI SUMBER BISING
SPLN 58 : 1984 KOMISIONING PLTG
SPLN 62-1 : 1986 STANDAR OPERASI PUSAT LISTRIK TENAGA UAP
BAGIAN SATU : POLA PENGUSAHAAN
SPLN 62-2 : 1987 STANDAR OPERASI PUSAT LISTRIK TENAGA UAP
BAGIAN DUA : FAKTOR-FAKTOR PENGUSAHAAN
SPLN 73 : 1987 KOMISIONING JARINGAN
SPLN 79 : 1987 STANDAR OPERASI PUSAT LISTRIK TENAGA DIESEL
SPLN 80 : 1989 STANDAR OPERASI PUSAT LISTRIK TENAGA GAS
SPLN 85 : 1990 KOMISIONING KETEL UAP
SPLN 86-2 : 1992 KOMISIONING TURBIN UAP PUSAT LISTRIK
BAGIAN 2 : PERHITUNGAN UNJUK KERJA TURBIN UAP
SPLN 86 : 1990 KOMISIONING TURBIN UAP PUSAT LISTRIK
BAGIAN 1 : UMUM
SPLN 89-1 : 1991 GETARAN MESIN PEMBANGKIT
BAGIAN 1 : PEMANTAUAN GETARAN MESIN PEMBANGKIT DALAM
KONDISI OPERASI NORMAL
SPLN 89-2 : 1994 GETARAN MESIN PEMBANGKIT
BAGIAN 2 : IDENTIFIKASI GETARAN TIDAK NORMAL PADA MESIN
PEMBANGKIT
SPLN 90-2-1 : 1995 KOMISIONING PLTA
BAGIAN 2-1 : PEDOMAN PENGUJIAN PRAJALAN TURBIN AIR DAN
PERALATAN BANTUNYA
SPLN 90 : 1990 KOMISIONING PLTA
SPLN 111-1 : 1994 MANAJEMEN PEMELIHARAAN PUSAT LISTRIK
BAGIAN 1 : UMUM
SPLN 111-4 : 1995 MANAJEMEN PEMELIHARAAN PUSAT LISTRIK
BAGIAN 4 : MANAJEMEN PEMELIHARAAN PLTD
SPLN 112 : 1994 AMBANG BATAS KUAT MEDAN LISTRIK DAN INDUKSI MEDAN MAGNIT
DIBAWAH SALURAN TEGANGAN TINGGI DAN EKSTRA TINGGI
SPLN 68-1A : 1986 TINGKAT JAMINAN SISTEM TENAGA LISTRIK
BAGIAN SATU : SISTEM TENAGA HULU
A. PEMBANGKITAN
BIDANG SCADA
SPLN 109-1 : 1996 POLA SCADA
BAGIAN 1 : PEDOMAN DASAR
SPLN 109-2 : 1996 POLA SCADA
BAGIAN 2 : PENGATUR ANTAR REGIONAL
SPLN 109-3 : 1996 POLA SCADA
BAGIAN 3 : PENGATUR WILAYAH
SPLN 109-4 : 1996 POLA SCADA
BAGIAN 4 : PENGATUR REGIONAL
SPLN 109-5 : 1996 POLA SCADA
BAGIAN 5 : PENGATUR DISTRIBUSI
SPLN 109-6 : 1996 POLA SCADA
BAGIAN 6 : PENGATUR SUBREGIONAL